Engineering authorisation required
Systems control
11 of 18 systems nominal, drawing 133% of the main bus. Adjust output in ten-percent increments or change a system's status directly.
Engineering
4 systems · 49% draw
Impulse Drive
nominalEngineering · 12% draw86%Structural Integrity Field
cautionEngineering · 9% draw64%Warp Core
nominalEngineering · 22% draw98%Medical
2 systems · 7% draw
EMH Holoemitters
cautionMedical · 3% draw68%Sickbay Biobeds
nominalMedical · 4% draw100%Operations
5 systems · 34% draw
Environmental Controls
nominalOperations · 8% draw97%Holodeck 2
cautionOperations · 5% draw45%Life Support
nominalOperations · 15% draw99%Replicator Network
offlineOperations · 0% draw0%Transporter Room 1
nominalOperations · 6% draw95%Science
3 systems · 10% draw
Astrometrics Lab
offlineScience · 0% draw0%Long-Range Sensors
nominalScience · 7% draw88%Subspace Telescope
nominalScience · 3% draw76%Tactical
4 systems · 33% draw